Please activate JavaScript!
Please install Adobe Flash Player, click here for download

Dental Tribune Indian Edition

20 Dental Tribune Indian Edition - September 2013 Author_ Dr Nilesh Parmar, UK _Guided surgery has been around for a long time. However, very few dentists in the United Kingdom place implants using surgical guides. The reasons for this are multiple, ranging from dentists not wanting to follow the procedure, or not having confidence in the procedure, the increased costs of guide fabrication, and the time delay and extra appointments needed to obtain a fully functional and reliable surgical guide. In this case report, I shall demon- strate a surgical guide manufactured in-house using the CEREC Bluecam (Sirona). These guides do not require any impressions to be sent to a third party and can be made rather cheaply in the surgery within around 30 minutes. The guide can then be used in conjunction with specific drill keys, which are compatible with the guided surgery drill sets from all leading implant manufacturers. In this particular case, Facilitate (Astra Tech/DENTSPLY Implants) was used to place the implant. Once the implant was osseointegrated, the final restoration was fabricated chairside using the CEREC MC XL milling machine (Sirona) and an IPS e.max CAD block (Ivoclar Vivadent). _Case report A young female patient had lost tooth 36 a few years ago and wanted an implant solution. Her medical history was clear and she had a mildly restored dentition with no current dental pathology. Her BPE scores were low, with excellent oral hygiene. The patient was scanned using the CEREC Bluecam and a proposal for the missing tooth was created. A collimated CBCT scan of the lower jaw was taken using GALILEOS (Sirona) with a CEREC Guide refer- ence body set in thermoplastic over the edentulous area. The reference body is identified by the software and a virtual implant placement along with the CEREC crown proposal is imported into the software. This allows the clinician to place the implant virtually, with reference to the ideal final crown position. In this case, it was deemed that a screw-retained restoration would be desirable; hence, the screw-access hole was positioned through the centre of the crown. Once the implant position had been decided, the information was ported to the CEREC software and using a CEREC Guide Bloc a drill body was milled by the CEREC MC XL milling machine. Once this has been milled, it will lock tightly into the thermoplastic drilling template. At this point, the surgical guide is complete and can be used on the patient. In this particular case, an Osseo- Speed TX implant (DENTSPLY Implants) (4.0 × 11 mm) was placed using the surgical guide. The patient was prepared in accordance with a standard sterile protocol and the area anaesthetised as one would for a regular implant placement. The surgical guide snaps firmly over the existing teeth, expanding over- and undercuts, becoming a very stable platform through which to drill. The Facilitate soft-tissue punch was used to remove the overlying soft tissue, and a standard drilling protocol using the Sirona drill keys was followed. A high primary stability of 40 Ncm was obtained and a 4 mm healing abutment was placed immediately. The patient healed with no pain, no swelling and no discomfort. The post-operative long-cone periapical radiograph corresponded well with the preoperative planning with an ideal angulation for a screw-retained crown. After two months of healing, a fixture-level open-tray impression was taken and cast up using an Astra Tech replica. A standard metal abutment Guided implant surgical placement with CAD/CAM CEREC crown Figure 1: Reference body with CEREC Guide mill block. Figure 2: Thermoplastic warmed in hot water and placed over the working model. Figure 5: CBCT with reference body and CEREC proposal overlay. Figure 6: CEREC Guide in-situ. Figure 3: Reference body and thermopla- stic surgical guide. Figure 9: Directional indicator to assess osteotomy position. Figure 10: Implant placement. Figure 4: Reference body and thermopla- stic guide in-situ prior to CBCT scan. Figure7:AstraTech(DENTSPLYImplants)faci- litatebiopsypunchusedthroughCERECGuide. Figure 8: Soft tissue removed. Figure 11A: Placement of a 4 mm healing abutment at stage 1. Figure 11B: Post-op RTG view. Figure 12: Fixture level open-tray impres- sion. Figure 13: Standard abutment with 3 mm of occlusal clearance. Figure 14: Soft tissue profile after two months healing. Figure 15: CEREC image of the abutment. Figure 16: CEREC image of final resto- ration. Figure 17: CEREC image of the block. Figure 18: E-max crown glaxed, stained and ready for sintering. Figure 19: Milled E-max CAD/CAM crown with screw hole. Figure 20: Screw retained E-max crown. Figure 21 & 22: Final restoration in-situ. Dr Nilesh R. Parmar, BDS (Lond.), M.Sc. (Prosth. Dent.), MSc (Imp. Dent.), Cert. Ortho., was voted Best Young Dentist in the East of England in 2009 and runner-up in 2010. He was short-listed for the Private Dentistry Awards in 2011 in the category of Outstanding Individual. He has a master’s degree in Prosthetic Dentistry from the Eastman Dental Institute and a master’s degree in Clinical Implantology from King’s College London. He is one of the few dentists in the UK to hold a degree from all three London dental schools and recently obtained his Certificate in Orthodontics from the University of Warwick. His main area of interest is dental implants and CEREC CAD/CAM technology. Nilesh runs a successful five-surgery practice close to London and is a visiting implant dentist at two Central London practices. Nilesh has a never-ending passion for his work and is well known for his attention to detail and his belief that every patient he sees should become a patient for life. He offers training and mentoring to dentists starting out in implant dentistry. More information can be found on his website, www.drnileshparmar.com; Twitter: @NileshRParmar; or Facebook: Dr Nilesh R. Parmar. Contact Info → DT page 22 Implant Therapy